Re: HA RA SUFF Hammock, well 239887
Last info on SONRIS seemed to indicate spud of 7/9, surface casing complete and drilling. Today, Nabors 507 derrick down, loaded on trucks and headed to another location

What happened? Could it just be mechanical failure and another rig will be set up to complete the well, or is it all over?

thanks for any input

Views: 30

Reply to This

Replies to This Discussion

I'm not expert, but looking at the permit, that was probably the "spudder" rig, they'll send in one of the big boys to finish.
Sheeza, Essay is probably correct. Petrohawk tends to use smaller rigs to drill the vertical section and then bring in a larger rig equipped with top drive to drill the horizontal section.
Chesapeake does that too. They spud with a small rig and within a week or so the big rig comes in, along with the trailor house village.

RSS

Support GoHaynesvilleShale.com

Blog Posts

The Lithium Connection to Shale Drilling

Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…

Continue

Posted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service