1. SET CIBP @ 15,473' MD IN THE 7- 5/8" LINER 2. BAIL 12' OF 16.0 PPG CEMENT ON TOP OF THE 7 - 5/8" CIBP 3. SET CIBP @ 5,999' MD IN THE 9 - 5/8" CASING 4. SET AND LOCK DOWN TEST PLUG IN WELLHEAD -THESE PLUGS MAY NEED TO BE DRILLED OUT FOR PROPER P&A
Tags:
Set cement bridge plug @ 15,473' Measured Depth in the 7 - 5/8" Liner. Bail 12' of 16 Pounds Per Gallon cement on top of the 7 - 5/8" Cement Bridge Plug @ 5,999' Measured Depth in the 0 - 5/8" casing. Set and Lock down test plug in well head.
This looks like a temporary P&A but without identifying the specific well, it is impossible to say. If the well will be eventually Plugged & Abandoned, these plugs would have to be drilled out and replaced with proper plugs and casing cement that meet state requirements. This appears to be a test well.
If you post the SN or another form of ID I can help you.
Expand - EGC 27&34-9-8 HC #1
https://sonlite.dnr.state.la.us/ords/r/sonris_pub/sonris_data_porta...
It is a pilot hole for the Haynesville/Bossier. Rumor is that the well experienced higher than normal bottom hole temps and they decided to move off location and pause. Maybe we wait for the 3D data before going HZ.
307 members
409 members
286 members
6 members
49 members
© 2026 Created by Keith Mauck (Site Publisher).
Powered by