SONRIS Lite reports that the SWN BML PROP 31-22-1H in Ora Field spudded on 2/19/2012 and as of 2/20/2012 was drilling at 2185 feet.

http://sonlite.dnr.state.la.us/sundown/cart_prod/cart_con_wellinfo2...

Views: 45180

Replies to This Discussion

was told flowing csg pressure is 3600psi and making 3.0mcfd of gas and he would only say that they were excited about the oil recovery....???

Thanks for sharing Whodat.   I know very little about gas wells. Can you tell me if 3mcfd is a signicifant amount of gas?  I am encouraged to hear the excitement on the oil recovery.  I hope the BML is a marker for the Brown Dense.  I would love to see North Louisana and Southern AK prosper in the oil business.  

3 million cubic feet of gas per day is a decent amount for example the average well for the fayetteville shale produces around 2.0mcfd ( I tested the fayettville wells for about 3 years)

Thanks for putting the gas numbers in perspective. SWN has been talking to our family about a gas pipeline crossing our land from the BML.

Has there been any projections yet as to decline rates for the Brown Dense?

 

Are they anticipated to be similar to those seen in other unconventional reservoirs (e.g. Eagle Ford and Haynesville) where there is a 70 to 80% production decline over the first year?

 

Thanks for any comments on this

None of that information has been released yet Mark. Maybe we'll get some new info with the Aug 3rd conference call from SWN.

Mike,

have you heard any new flowback numbers???

Latest SONRIS Lite report (7/24/2012):   7/23/12, WELL CONTINUING TO FLOW BACK FRAC FLUIDS. RUNNING IN HOLE TO DO A BOTTOM HOLE PRESSURE TEST.

http://sonlite.dnr.state.la.us/sundown/cart_prod/cart_con_wellinfo2...

Thanks Obed~  I was there this weekend. I watch the flare from about six miles away and it was really bright.  You could her the roar that sounds like a huge cutting torch too. 

How long can they flare all that gas?  Has anyone heard if there is a plan in the works to run a pipeline to capture that NG and sell it.

I know SWN plans to lay an 8in from what ive heard that will tie in all the gas from the future wells in that area to go to a plant in dubach.

Latest SONRIS Lite report for BML well (7/31/2012):

07/30/12: RUNNING 2-3/8" & 2-7/8" TUBING W/ WORK OVER RIG. 07/30/12: WELL CONTINUES TO FLOW BACK FRAC FLUIDS.

http://sonlite.dnr.state.la.us/sundown/cart_prod/cart_con_wellinfo2...

RSS

Support GoHaynesvilleShale.com

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service