Out walking this afternoon, noticed crane and noise from S/N 240455, HA RA SUV;DONNA DUNN 19 H #1 well site. I have not seen any frac equipment or trucks, but could have missed them.
At any rate if you're following this section, they're working!
FXEF, I heard yesterday that Sec. 19 had a vertical Haynesville but no laterals because of a fault. Have you heard that? The source I heard it from was not that reliable, so consider the source.
The Donna Dunn 19H #1 is a horizontal.
Total Depth: 11860'/ 15437' /
PERFS 12,160-15,307'
FRAC STAGES: 14
I was told that the Green Rives 21H #1 was to only have vertical fracs, however there is no frac data on SONRIS to support that. Only thing SONRIS shows is Total Depth:12194'/12765', looks like a very short lateral.
I'm guessing someone got sections 19 and 21 mixed up.
Crescent Directional Drillers did a MWD survey on 3-11-2010 and showed MD: 12765' and TVD: 12194.67' (SONRIS WELL ENGINEERING/MECHANICAL document). The next day (3-12-2010) Nabors started rigging down and moved to section 18. I am pretty sure that 12765' is the total MD, however there is not any data to show where the perforations are located. I was told by an Encana Rep. that it was to be completed as a vertical well, but no data to support that.
Believe nothing you hear, and only half of what you see. — Mark Twain
FXEF, you are correct. And I like Twain. It just seems strange that Encana would purposely drill a well that would appear be uneconomic. Yes, there is a fault in the section kittycatmama but Encana and the rest of the operators know it's location.
Kittycatmama. Section 21, not 19. The Elm Grove Fault. FXEF, looking at the well plat, this is the absolute worst part of the section to drill in drilling south from this surface location.
The completion documents for a well are on SONRIS Classic, not SONRIS Lite. But you can get there from the SONRIS Main Page by clicking on "Document Acess". Choose well permit to drill as document type, input well s/n and check the box for Get associated documents.