I have a credible witness who tells me that Chesapeake is proposing to build out the pad on the Briarwood-25, #1, (25-12-13) with plans to drill from there into S24-T12-R13W.   However, if you are a mineral owner in 24-12-13, I would not get too excited yet.  

The Briarwood was completed last summer and is still not in production.  

On a more positive note, I was told that the main trunk line being built by Louisiana Mid-Stream has been completed down to the top of the Battle Park, and all that remains to do is build and tie in the laterals.  (I tried to go see for myself, but ran into some serious mud.)

Views: 8

Support GoHaynesvilleShale.com

Blog Posts

The Lithium Connection to Shale Drilling

Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…

Continue

Posted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service