Recent information revealed a 2nd well in Sabine Parish was tested at over 20 MMcfd with a flowing pressure above 8000 psi. Although the well is now operated by Shell, the completion was executed by their JV partner EnCana. The previous super well was also in T9N-R11W (Section 20).
Shell, Robert Bozeman 29 #H1 Well, Serial #240815, S29-T9N-R11W, Sabine Parish, 20339 Mcfd, 25/64" Choke, 8714 psi Flowing Pressure
Tags:
Therese, the rig is currently drilling the Jean Larsen 17 #H1 Well although it may have finished by now. The surface casing has been set on the remaining five Haynesville Shale wells in this section and are waiting for a drilling rig.
Nabors #783 Rig, EnCana, Jean Larsen 17 #H1 Well, SN 242201, S17-T9N-R11W, Spud 4/3/11
68 members
478 members
194 members
11 members
405 members
18 members
250 members
457 members
11 members
388 members
Posted by Char on May 29, 2025 at 14:42 — 4 Comments
© 2026 Created by Keith Mauck (Site Publisher).
Powered by