The well permit is in my section and have not been leased. Just wondering if I was forced pooled or what is going on?? Should I have at leased had some kind of notification? Can someone please help me out with this? Thanks in advance!!!
Les, thanks for putting that attachment out there. Correct me if I am wrong, but I am assuming this means that they are putting the pad location in 10 with actual drilling and bottom hole in 3, leaving all umos out unless they decide to unitize or pool? I know I don't know a lot about this, but this is really confusing.
SS, units typically consist of only one section. So only mineral owners in Section 3 would paricipate in the Comstock well. Comstock (or another company) may also be planning to form a unit in Sec 10 and complete a separate well in that section.
You can put a drilling rig in section A and drill into section B. The well would only draw gas from section B.
The property owners in section B are the only ones who would get any revenue from the gas produced. In theory, none of the gas from section A is touched by the well.
The production company would have to have permission from the property owner in section A where the well sits, plus permission from anyone in section A whose land the well bore or pipeline passes under. Other property owners in section A don't get anything or have any say.
Section B would probably be pooled. No pooling or lease is needed for section A.
The reason they drill from one section to another is that you have more room to make the turn from vertical to horizontal and have a longer horizontal section in section B.
By the way, I got a notice on unitization, but two separate permits have been issued, and I never got a notification of the permit being issued.