Just wondering on the typical turn around time for Sonris to start showing IP rates on completed wells. I am looking for some news on the Sonris Site for completed well in T-11 R-15, and last reports I see were still drilling on 2/5, when total depths I understand were reached and frac should have been completed, or, underway at present. Is Sonris just so overworked that their Scouts don't have time to cover all field work?

Thanks,

Shelby

Views: 43

Reply to This

Replies to This Discussion

Shelby, typically the operators will file the State Potential Report (initial test rate information) with the State within 1-3 weeks after the well completion. There can be a lengthy time period before the State loads this information into Sonris. I assume this is due to the significant increase in workload over the last year.
Thanks Les B,
Think they should hire more Scouts? Sounds like there is lots of drilling going on.
Shelby
I have emailed sonris and they say it is the state, I emailed the state and they say it is lag time. To me its seems like a very long lag time. I have two wells less than three miles apart and one has reported spud and the other is reported as a location and they both have been drilling for 45 days.

RSS

Support GoHaynesvilleShale.com

Blog Posts

The Lithium Connection to Shale Drilling

Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…

Continue

Posted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service