How long does the typical frac stage method take (12-16 stages)? It looks like some operators have the drill time down to 40 days but I can't pinpoint the fac time table per well. Any idea?
Parkdota, the issue is trying to schedule the frac crew and get all the equipment on location after the drilling rig is moved off. Once in "superpad" mode the operator may be able to shorten the time between drilling end and the start of completion operations.
KCM, operators typically only want to drill double length laterals if they can complete the entire length. Exception might be to drill under a large lake and in those cases the operator would apply for larger units.
Jack, it depends on the operator, area and design but generally in the range of 12 to 23 stages. Some operators are going for more stages but shorter intervals per stage.