These photos were taken on 2/8/11 from vehicle. The site is about one mile west of the Hwy 96 / Hwy 103 intersection and on the south side of Hwy 103. The sites are adjoining.
The top photo shows a well head from an old drill site. Now they have poured large concrete slab.
The bottom photo is east of photo #1. It appears they are building a large pit of some type.
Just wondering what is happening??
And if this subject has been covered in other postings, please excuse.
Tags:
68 members
478 members
194 members
11 members
405 members
18 members
250 members
457 members
11 members
388 members
Posted by Char on May 29, 2025 at 14:42 — 4 Comments
© 2026 Created by Keith Mauck (Site Publisher).
Powered by