I drove by the Marion Reeves well on Pilgrim Rest Road yesterday and saw to my surprise that a christmas tree was there and all equipment was gone!  My neighbor said the pipeline is already in--does anyone have any news about production etc on this well?  And is that rig moving to the Howard Montgomery well?

Views: 244

Replies to This Discussion

COMPANY: Beusa Energy Inc, ha ra sutt; Marion Reeves Jr 6h, 001: 241080. WHERE: Sligo, S 6. T. 17N R. 10W. DAILY PRODUCTION: 5470 mcf gas on 11/64 choke; 0 barrels n/a gravity condensate; 39 barrels water. PRESSURE: 8250 lbs. SPECIFICS: Haynesville RA; perforations, 13965-17692 feet, depth, 18000 feet.

Skip,

 

Any opinion or comment reqarding these results? Isnt that pretty decent pressure?

Yes, better than the average HA horizontal well.  On a more open choke the IP would probably be double which would make it a very good well for this area.  Hopefully the results will cause BEUSA to invest in some additional wells.  Or be a valuable datapoint to attract another operator in the future.

RSS

Support GoHaynesvilleShale.com

Blog Posts

The Lithium Connection to Shale Drilling

Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…

Continue

Posted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service