SONRIS Lite reports that the SWN BML PROP 31-22-1H in Ora Field spudded on 2/19/2012 and as of 2/20/2012 was drilling at 2185 feet.
http://sonlite.dnr.state.la.us/sundown/cart_prod/cart_con_wellinfo2...
Tags:
There is no new public information since the last posts.
Thanks for the info~~~ It is much appreciated. I will be awaiting any futher information that you can provide. Have a good day.
Looks like this well is a little further west than what I was thinking.
keeping a close eye on these developments. The Ouachita RR runs through Union Parish to Lillie and watching to see the possiblilty of future rail frac sand, pipe, and crude moves.
Nothing solid as of yet,,,,,several inquiries though and working some rail rates.
If this works out you could come out very well. Could you possibly open up the old line all the way down to Bernice or is that line lost forever?
Yes, the line could be reopened.
No, the City owns the right of way to Bernice. With the land north of town and the warehouse complex, Bernice could be sitting in the right place with the right infrastuce for the oil industry.
9 5/8" casing was set in this well to 7921 feet on 2/28/2012:
http://sonlite.dnr.state.la.us/sundown/cart_prod/cart_con_wellinfo2...
Total vertical depth of 10783 feet was reached on 3/7/2012, according to SONRIS Lite, so I suppose they must be about ready to start the lateral.
http://sonlite.dnr.state.la.us/sundown/cart_prod/cart_con_wellinfo2...
68 members
478 members
194 members
11 members
405 members
18 members
250 members
457 members
11 members
388 members
Posted by Char on May 29, 2025 at 14:42 — 4 Comments
© 2026 Created by Keith Mauck (Site Publisher).
Powered by