Petrohawk Announces Three New Haynesville Shale Wells Placed on Production at a Combined Rate of 73 Mmcfe/d
Posted 09 December 2008 @ 07:00 am EST
HOUSTON, Dec. 9 /PRNewswire-FirstCall/ -- Petrohawk Energy Corporation("Petrohawk" or the "Company") (NYSE: HK) has placed three additionalHaynesville Shale wells on production at a combined rate of 73 Mmcfe/d, onewith the highest reported initial production rate of any well in Petrohawk'shistory, as follows:
The Brown 17 #4 (69% W.I.), located in Section 17-T16N-R11W, Bossier Parish, Louisiana, was completed on November 18 and produced at a rate of 23.4 Mmcfe/d on a 26/64" choke with 7,700# flowing casing pressure. The Goodwin 9 #5 (97% W.I.), located in Section 9-T16N-R11W, Bossier Parish, Louisiana, was completed on November 25 and produced at a rate of 21.1 Mmcfe/d on a 26/64" choke with 6,750# flowing casing pressure. The Sample 9 #1 (100% W.I.) is located in Section 9-T14N-R11W, Red River Parish, Louisiana, approximately 12 miles south of Elm Grove Field. It was completed on November 27 and produced at a rate of 28.2 Mmcfe/d on a 30/64" choke with 7,100# flowing casing pressure. The Company expects to complete five additional Haynesville Shale wells bythe end of the year.