Trinidad Drilling Rig 103 spud 8/13 reports 3 days Drilling Ahead, 8/15.

Views: 1059

Replies to This Discussion

Thank you very much for sharing these weekly reports with us.

You're welcome.  Keep in mind that the reports are dependent on the accuracy of the specific data filed by the drilling subcontractor and the process of accumulating and publishing that data by the rig reporting company.  Mistakes occasionally happen and I try to figure them out, if possible, including sometimes contacting the reporting company.  For example there are now a large number of units, and wells, with the name CMR-Foster Creek followed by numbers designating the sections where the well is located.  Also in MS it is common when forming a unit to permit two wells.  So there are two wells permitted with the same name in the same location but one is #1 and one is #2.  It can get confusing for everyone involved with tracking and reporting. 

Trinidad Drilling Rig 103 spud 8/13 reports 10 days Drilling Ahead, 8/22.

Trinidad Drilling Rig 103 spud 8/13 reports 17 days Drilling Ahead, 8/29.

Trinidad Drilling Rig 103 reports 24 days Drilling Ahead, 9/5.

Hi Skip - How did you find that on drilling ahead? I was looking at the website but can only find the Canadian rigs. 

Walt, what website?  Are you referring to the SONRIS database?  You can not track drilling ops in any way approaching real time on SONRIS.  It is common for the  rig to be be finished and gone before the spud is reported on SONRIS.  The information on SONRIS is provided by the well operator.  The drilling reports that I post come from my subscription to the Weekly Drilling Report by RigData.  That information comes from the drilling contractor and must be much more timely as it's main use is by field services that support a drilling rig.  It can be a challenge to find remote locations where rigs are drilling and the weekly rig report includes directions to rig locations.

Sorry - Thought you were referring to something like this: http://www.drillingahead.com/trinidad-drilling-rig-fleet-map

Nope.  No apology necessary.

Trinidad Drilling Rig 103 reports 31 days Drilling Ahead, 9/12.

Trinidad Drilling Rig 103 reports 38 days Drilling Ahead, 9/19.

Trinidad Drilling Rig 103 reports 45 days Drilling Ahead, 9/26.

RSS

Support GoHaynesvilleShale.com

Blog Posts

The Lithium Connection to Shale Drilling

Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…

Continue

Posted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service