That one was just approved on the 15th. It is permitted both vertical & horizontal and has a note on the vertical section: The vertical, exploratory pilot hole in Wildcat Field will not be completed or produced. The system still required terminus and POP data for Wildcat Field so the SL information was re-entered. The full name of the nearest town is Kildare Junction.
It is also permitted for the McLeod, North (CV) at the same depth so they expect to land the lateral in the CV.
W-1 has a plat for each profile.
What is the geology on this? I assume the old Rodessa field and looking for what Stroud found North of McLeod with the Arkla-Blackstone. I heard it was down to about 100 barrels a day but was producing a lot of water.
Scandrill Endeavor was rigging up on Friday. Spud scheduled for Saturday.
Scandrill Rig Endeavor reported 50 days Drilling Ahead, 11/14.
Thank you! I'm new at this, hope that is a good thing!
You're welcome. It's neither good nor bad. We'll have to wait for the well to be completed before we can judge the result.
does anyone know if this well has turned horzintel yet
They have not turned in a drilling depth on the weekly reports so it's impossible to say. This one was permitted vertical/horizontal so they probably are looking at whatever science data they have gathered from the well to determine where to land the lateral (or if they even want to drill it).
i hear they have setcasing and are moving the rig off dont they bring anoutyer rig wheen they turn horzintal sometime
Skip you should know
Waylon all I know is that the rig is no longer reporting from that well. Anything beyond that would be conjecture. Maybe Julie can provide you with more information.,
409 members
307 members
286 members
6 members
49 members
691 members
253 members
7 members
549 members
20 members
Posted by don burkett on September 17, 2026 at 10:08
© 2026 Created by Keith Mauck (Site Publisher).
Powered by