It appears as though EnCana has selected a location for one of their initial pilots of the "Gas Factory" concept. They have recently permitted six (6) new wells that will all be drilled from a surface location in the southwest corner of Section 26 in T15N-R14W. Four (4) of these wells will be drilled into Section 35 and the remaining two (2) drilled in Section 26. There is already one previously drilled well at this surface location.
EnCana, Jackson Davis 26 #H2 Well, Serial #241289, S26-T15N-R14W
6 members
409 members
253 members
287 members
307 members
© 2026 Created by Keith Mauck (Site Publisher).
Powered by
GoHaynesvilleShale.com is where mineral owners, landowners and oil & gas professionals discuss the Haynesville Shale, Austin Chalk, Terryville Complex, Tuscaloosa Shale, Lower Smackover Brown Dense and lithium plays. Ask questions, share what you know, and keep up with activity in your parish or county. [ Read More ]