Anyone local to the Avoyelles area hearing anything about the Eagles Ranch Well? It appears that they recently finished drilling well and should be moving frac crews on location soon.

Views: 37735

Reply to This

Replies to This Discussion

Looks like SONRIS updated the Gas Production numbers.

LEASE\UNIT\WELL PRODUCTION

RPT DATE LUW CODE STORAGE FAC DOC USE WELL CNT OPENING STK OIL PROD(BBL) GAS PROD(MCF) DISPOSITION CLOSING STK PARISH
02/01/2019 052025 1 510 1414 3696 1591 333 AVOYELLES
01/01/2019 052025 1 267 1696 1823 1453 510 AVOYELLES
12/01/2018 052025 1 414 2123 1769 2270 267 AVOYELLES
11/01/2018 052025 1 702 2161 1734 2449 414 AVOYELLES
10/01/2018 052025 1 319 2507 2107 2124 702 AVOYELLES
09/01/2018 052025 1 470 2728 2523 2879 319 AVOYELLES
08/01/2018 052025 1 277 3413 3355 3220 470 AVOYELLES
07/01/2018 052025 1 332 3612 3490 3667 277 AVOYELLES
06/01/2018 052025 1 612 3783 3569 4063 332 AVOYELLES
05/01/2018 052025 1 350 4792 4760 4530 612 AVOYELLES
04/01/2018 052025 1 477 5291 4906 5418 350 AVOYELLES
03/01/2018 052025 1 488 6374 5741 6385 477 AVOYELLES
02/01/2018 052025 1 548 7382 6916 7442 488 AVOYELLES
01/01/2018 052025 1 177 8801 8334 8430 548 AVOYELLES
12/01/2017 052025 1 378 11171 10765 11372 177 AVOYELLES
11/01/2017 052025 1 622 14192 15394 14436 378 AVOYELLES
10/01/2017 052025 1 453 27609 29029 27440 622 AVOYELLES
09/01/2017 052025 1 0 26896 24024 26443 453 AVOYELLES

If that gas volume is correct, that is a massive change in GOR from the previous trend - basically around 1000:1 to over 2600:1. It will be interesting to see future months to see if this trend continues.

Or I wonder if EOG has done something to the wellbore that is impacting production? 

April 23 2019 production test shows test rate of 56 BO, 72 MCF and 249 BW on a 64/64" choke with 138# tubing pressure. Slight drop in oil cut (22.5%) from previous test (25%) - appears that well has settled into to a consistent albeit less than sterling "groove".

But remember that this still a toe down well that doesn't appear to have any artificial lift installed to unload the wellbore.

Using DrillingInfo.com EUR calculator, this is a 316 MBO and 321 MMCF well (projection out to 2069). Point forward economics tied to both product costs and operating costs (plus mechanical integrity of the lateral wellbore over time)

Attachments:

RSS

© 2019   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service