The rig has as moved on so both wells should be at total depth (TD). No Work Permit issued yet for completion operations.
HA RA SU113;ATKINS ETAL 6-7 HC |
001 |
006 |
16N |
16W |
07/31/2018 |
17017362150000 |
SCOUT INFO
REPORT DATE |
WELL STATUS |
MEASURED DEPTH |
TRUE VERT DEPTH |
DETAIL |
02/15/2019 |
05 |
21062 |
TD 1/30/19 |
HA RA SU61;M&K MIN 33-4 HC |
001 |
033 |
17N |
16W |
09/10/2018 |
17017362300000 |
SCOUT INFO
REPORT DATE |
WELL STATUS |
MEASURED DEPTH |
TRUE VERT DEPTH |
DETAIL |
01/22/2019 |
05 |
20500 |
TEST CASING |
|
12/27/2018 |
05 |
20500 |
SET 5 & 5 1/2 TO 18264' W/ 1350 SX |
The time varies from a couple of months to maybe as much as five. Ensight IV is a new operator with no past history to base a guesstimate on.
Recently? Which two units (sections)? No, Comstock has not bought out Ensight IV as far as I know.
The letter was dated Feb 14, 2019. It states that Comstock Oil and Gas-Louisiana, LLC intends to make application to utilize 9 lateral cross unit laterals for Haynesville wells in Units HA RA SUH APO 270-MM-2 and HA RA SUI APO 270-MM-6. These units are comprised of Sections 5, 6 ,7 and 8 of T 16N R16 W in the Greenwood-Waskom Field. There is a map showing the laterals. I think the well with the most westerly lateral has already been drilled by Ensight, but is not developed or producing yet.
The Commissioner of the Office of Conservation has recently approved a change in the one operator per unit policy. Now a unit operator may allow another company to drill HC (Cross Unit Lateral) wells that include one or more their units. Or, this may simply be a change of unit operator. We'll see after the hearing date. The application should be available in the database in the next week or ten days. Whichever the case, I think it is a good turn of events for mineral owners in those units/sections. Comstock has a good reputation as a horizontal Haynesville operator and Ensight IV is new and a little bit of an unknown.
I did not have a complete and got the wrong ref. It is T 15 N R 16 W. So it is 6 miles south. Regardless, good news for those owners.
Thanks for the correction.
They may be delaying completion until they have an agreement with a midstream company to take the gas post-completion.
From what I hear, I think CG is correct. Bud, there are literally thousands of wells, if not tens of thousands, across major US basins drilled but not completed. They are called DUCs. As long as the lease terms are satisfied, there is no restriction on delaying production. In the case of the Ensight well you are interested in, I do not believe the SONRIS Well Scout report is up to date or fully accurate. I think the well has been completed but there is a problem with a pipeline connection. I think that will be solved soon.
11 members
458 members
151 members
195 members
19 members
406 members
252 members
388 members
174 members
68 members
Posted by Char on May 29, 2025 at 14:42 — 4 Comments
© 2026 Created by Keith Mauck (Site Publisher).
Powered by