This Joe says that if they go under that whoever holds their lease will take over. Whether they decide to finish or not is another story. As far as I know the status drilled uncased hole waiting for funding.
If you are looking for info call
MNLU's Investor Relations: Mike Parker, 1 (608) 721-0331
Skip,
MNLU press releases seem to be worth the same as their stock!
I t should be secure.
Although, this well is well past a year since spud. pretty sad.
Joe,
I have "Reported 9 5/8" casing set & cemented @ 12,940' on 8/27/2010." in my notes. The well has some casing, however most likely does not have production casing. I seem to recall discussion that production casing was to be shipped from Japan and was delayed due to the tsunami. Then came the flooding.
Their press releases are somewhat confusing re: production casing.
January 4, 2011:
Mainland Sets Production Casing On Its 22,000 Foot Well Deep Haynesville Shale Well In Mississippi
Houston, TX – Jan. 4, 2011 - Mainland Resources, Inc. (the “Company” or “Mainland”) (OTCQB: MNLU, Frankfurt: 5MN) (www.mainlandresources.com) reports that it has set production casing at its Burkley-Phillips #1 well in Jefferson County, Mississippi. At a total depth of 22,000 feet, this well qualifies as one of the top-ten deepest US onshore wells drilled in 2010.
http://www.mainlandresources.com/index.phpoption=com_content&vi...release-01-04-2011&catid=46
March 29, 2011:
NEWS RELEASEMainland Provides Update On Completion Program For The Buena VistaBurkley-Phillips #1 Well, MississippiHouston, Texas - March 29, 2011- Mainland Resources, Inc. (the "Company" or "Mainland") (OTCQB: MNLU, Frankfurt: 5MN) is progressing with the planning and design of the completion program for the Burkley-Phillips #1 well drilled in Jefferson County, Mississippi, allowing the Company to flow test the well and further determine its resource potential.
(last paragraph, page 1)
Mainland is in the process of ordering completion equipment and has sourced longer lead equipment, including production casing, wellhead, tubing and other surface facilities to be installed on the well. They are also working on orders for the production packer and various other down-hole items required at and for completion
http://www.mainlandresources.com/pdf/newsreleases/2011/MRI-NR-3-29-...
It seems possible (probable?) that they didn't elaborate enough in January about the true status of the well casing. They didn't actually say they set casing in the entire well bore. They just said they set casing and that the well is 22,000' feet deep.
Honestly, if the well isn't case (as appears to be the case) they had better of at least set a deep bridge plug or a balanced cement plug. If not, there are two major issues - is there building gas pressure from the Hanesville - yes it's tight but it's not impermeable. It will be flowing this entire time and they could end up in a hell of a well control mess. Secondly, a year later - do you really expect to get casing to bottom now? I'd wager a pretty good size bet, it will be a struggle to do so and will probably be a terrible cement job as the open hole will be falling apart (it's a rock mechanics issue more than a mud type reactivity issue.)
And, if they walk away from the well, does the lease holder end up with the liability for P&A the well? You can't leave it that way for the next 1000+ years in that state. Someone is going to have to spend money to properly P&A the well. That to me smells of more lawsuits over it and if they're out of money now, they're out of money to do a P&A too.
Sounds like this house of cards is tumbling...
William,
I agree with you 100%. The hole below the intermediate casing has probably heaved in. At the least that portion of the hole will have to be re-drilled. Drilling won't be that difficult as long as they don't get "kicked out" of the old hole. They will probably have voids and washouts and take a "lot" more cement to get a good cement job.
I also agree with you on the safety of the well in its current state. It looks like a disaster waiting to happen. As for as the liability of P&Aing the well I think the State would be liable for the P&A. They issued the permit to drill.
Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…
ContinuePosted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40
386 members
27 members
455 members
440 members
400 members
244 members
149 members
358 members
63 members
119 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com