Serial no. 241183 (south Caddo) has 2 companies listed as operator

I was checking on this for a friend. Note the Spud date was 10/1 and TD was 10/2. What's up with this section. I can't interpret what is going on

Views: 9

Reply to This

Replies to This Discussion

The state database organizes well files by surface location and section. Since a horizontal well may have a surface location in one section but the lateral perforations in an adjoining section, you need to check the PBHL (Planned Bottom Hole Location). In this case the well surface location is in Section 22 but the lateral perforations in Section 15. The TD date is likely a typo and should read 10-25-10.
KCM, it can happen as Chesapeake has taken over as operator from Camterra. It has also happened a few times between Shell and EnCana.

The TD date is a typo and was probably supposed to be 10/22/10.
Skip, Les, thanks to both for the info. I had not seen anything like this on Sonris before so was confused.

RSS

Support GoHaynesvilleShale.com

Blog Posts

The Lithium Connection to Shale Drilling

Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…

Continue

Posted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service