Question: This refers to a company drilling within 330 feet of a Lesee's land and the resultant production/royalites.

 

Okay, so given that 330 is not a considerable distance in geological distances...what is the standard distance at which a company/drilling site must set back from adjacent land that is not covered in the lesee's lease?

 

Not making sense but, wouldn't the "new" frac tech, as opposed to vertical drilling pull resourses from adjacent land as the fracs would HAVE to extend beyond a mere 330 to either side of the horizontal bore hole?

 

As an example: W side of S 25 / E side of S 24? (in any township or range).

 

Can someone enlighten me (if I have been at all clear with my question)?

 

Thanks!!

Tags: adjacent, drilling, for, from, intial, land, offset, pad, production, regulations, More…unleased

Views: 138

Reply to This

Replies to This Discussion

Wow. I could retire. Though, I don't want to give up land in case the next big thing comes through in my lifetime (put down the vodka, S. H.)
Thanks Les. I know I didn't ask that question effectively. But, that is the info I was asking for. So, if in a lease the terminology of "within 330' " is stipulated then the stipulation is valid. Meaning, my lease could ask for compensation IF a particular company is out of bounds or "within" 330' of my section.

Is 660' radius the standard for the horizontal perforations?

Thanks Les for your continued advice to all our inquires.
I could leave your question for Les, S.H. but since I answered your last I trust that it is okay to do so for this one. The 330' setback from unit lines by well bore perforatons is not a lease term, it is a state regulation. The specifics of frac designs are proprietary and rarely discussed publicly. The state is obviously drawing the line at a 330' radius but I do not know if it is verified. I suspect that there is a limit on the hydrologic pressures that can be introduced into a shale formation without pulverizing the formation proximal to the well bore perforations. There is likely a limit to how much pressure can be exerted but that is above my pay grade and there are a number of members better qualified to answer that question.
Oh, sorry Skip. I was reading faster than my brain could work. Argh. Again, sorry.
Oh, and I had a vodka in my hand, Skip. :)
It is always an honor to be mistaken with Les B. (he might not have the same opinion, LOL). And I always say, "I'd rather have a bottle in front of me than a frontal lobotomy! Cheers.
What would LA do to a driller if the 330ft was in violation? Fine them? Not produce from it?
Thanks to all. This/these are is/are the info I wanted to know. (dang my grammar).

RSS

Support GoHaynesvilleShale.com

Blog Posts

The Lithium Connection to Shale Drilling

Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…

Continue

Posted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service