Has anyone heard about some landmen looking to start up new TMS leases in Rapides Parish?

Views: 6285

Replies to This Discussion

BlackBrush extending pad...

Probably in the process of abandoning the old wellbore.

That's what I'm thinking.

BlackBrush rig still UP,,,,

I thinking trucks....

Great info Doug.  Tell Bob I said hi.

BlackBrush has not completed the North lateral...Beth, I will pass the message, thanks!

03/06/2018 05 18213 3/2/18, SET KICK OFF PLUG @ 13,980'. 3/4/18, KICKING OFF CEMENT PLUG. 3/6/18, CURRENT OPERATIONS, TIH W/CEMENT RETAINER.

Sorry, once I copied the above, I couldn't put a comment.  So, this is the latest that was posted today on Serial number 250723.

How about it Rockman, Skip or Jay, or one of you people that is much smarter than me.

sidetrack (Schlumberger Oilfield Glossary)

1. vb. [Drilling]
To drill a secondary wellbore away from an original wellbore. A sidetracking operation may be done intentionally or may occur accidentally. Intentional sidetracks might bypass an unusable section of the original wellbore or explore a geologic feature nearby. In the bypass case, the secondary wellbore is usually drilled substantially parallel to the original well, which may be inaccessible due to an irretrievable fish, junk in the hole, or a collapsed wellbore.
250723 BBJB PROPERTIES LLC 001 W4983 2593 40 00 023 01N 02E 01/19/2018 17079204600000
PRMT DATE SPUD DATE STAT DATE ST CD
01/19/2018 01/19/2018 01

WELL SURFACE COORDINATES

Surface Longitude Surface Latitude Lambert X Lambert Y Ground Elevation Zone Datum
92-14-50.6 31-2-32.36 2079120 136739 52.4 N NAD-27

WELL SURFACE COORDINATES GENERATED BY DNR

UTMX 83 UTMY 83 LONGITUDE 83 LATITUDE 83
571805.44200136 3434556.55598091 -92.24751942 31.04251245

BOTTOM HOLE COORD

EFFECTIVE DATE END DATE PLUGBACK TOTAL DEPTH TRUE VERTICAL DEPTH MEASURED DEPTH LAT DEG LAT MIN LAT SEC LONG DEG LONG MIN LONG SEC COORDINATE SOURCE LAMBERT X LAMBERT Y ZONE COORDINATE SYSTEM
01/19/2018 14500 18206 31 1 54.07 92 14 49.02 02 2079267 132871 N 01
01/19/2018 14500 18206 31 1 54.738 92 14 49.486 02 3360058 193574 N 02
01/19/2018 14500 18206 31 2 59.83 92 14 49.99 02 2079167 139514 N 01
01/19/2018 14500 18206 31 3 .491 92 14 50.46 02 3359958 200217 N 02

WELL HISTORY

SERIAL WELL NAME WELL NUM ORG ID FIELD ST CD PT WELL CLASS EFF DATE END DATE STAT DATE
250723 BBJB PROPERTIES LLC 001 W4983 2593 01 00 01/19/2018 01/19/2018

SCOUT INFO

REPORT DATE WELL STATUS MEASURED DEPTH TRUE VERT DEPTH DETAIL
03/14/2018 05 3/12/18, FUNCTION TESTED BOP'S. 3/13/18, SLIDE AND ROTATE DRILLING @ 13,898'
03/06/2018 05 18213 3/2/18, SET KICK OFF PLUG @ 13,980'. 3/4/18, KICKING OFF CEMENT PLUG. 3/6/18, CURRENT OPERATIONS, TIH W/CEMENT RETAINER.
02/27/2018 05 2/25/18, REACHED TD OF 18,213' 2/27/18, DP STUCK @ 14,228', PRESENT OPERATIONS, RIH W/STRING SHOT FOR ATTEMPTED BO @13,014'
02/20/2018 05 2/20/18, TRIPPING IN HOLE WITH MUD MOTOR AND BIT FOR AN ATTEMPT TO ENTER SOUTHERN LATERAL, TD 13,107'.
02/14/2018 05 2/9/18, TESTED HYDRILL & NOV TYPE 6012 10 M PIPE RAMS 250 PSI LOW, 5000 PSI HIGH FOR 30 MINS. TEST OK. 2/13/18, PRESENT OPERATIONS, GOING INTO HOLE, CIRCULATE & CONDITION OLD MUD AND DRILLING AS NECESSARY @ 7300'
02/07/2018 05 2/6/2018, PRESENT OPERATIONS, WASHING & REAMING @4000'
01/30/2018 05 3991 PRESENT OPERATIONS: FISHING FOR JUNK @ 3991'
01/24/2018 05 1/23/18, RE-ENTERED 1/23/18, TESTED HYDRILL & NOV TYPE 6012 10M PIPE RAMS TO 250 PSI LOW & 5000 PSI HIGH FOR 30 MINS. ON CHART, TEST OK. 1/24/18, PRESENT OPERATIONS, WASHING DOWN.
01/19/2018 01 18206 N 8 D 1' W-31,040.9' FR NGS MONU."FARR AZ MK" IN SEC 23.PBHL #1: N 57' 43" E-2775.69' FROM SL IN SEC 23.PBHL #2:S 2 D 10' 26" E-3871' FR SL IN SEC 23. (REDRILL OF SN 220356).

PERFORATIONS

SERIAL NUM COMPLETION DATE UPPER PERF LOWER PERF SANDS RESERVOIR

WELL TESTS

RPT TYP TEST DATE RPT DATE OIL POT COND GAS DEL WATER BSW% FLOW PRES SHUTIN PRES CHOKE UPPER PERF LOWER PERF BOT HOLE PRES

WELL ALLOWABLES

EFFECTIVE DATE END DATE LUW CODE LUW TYPE CODE ALLOWABLE ESTIMATED POTENTIAL CURRENT ALLOWABLE TYPE

LEASE\UNIT\WELL PRODUCTION

RPT DATE LUW CODE STORAGE FAC DOC USE WELL CNT OPENING STK OIL PROD(BBL) GAS PROD(MCF) DISPOSITION CLOSING STK PARISH

CASING

COMPLETION DATE CASING SIZE WELLBORE SIZE CASING WEIGHT UPPER SET DEPTH LOWER SET DEPTH CEMENT SACKS TEST PRESSURE HOURS UNDER PRESSURE TEST DATE CASING PULLED CREATION PROCESS

PLUG AND ABANDON

P and A DATE LOCATION TYPE CASING CUT TYPE CASING CUT DEPTH MUD WEIGHT LEFT COMMENTS

PLUGS

PLUG TYPE UPPER PLUG DEPTH LOWER PLUG DEPTH SACKS OF CEMENT SLURRY WEIGHT

TUBING AND PACKERS

COMPLETION DATE TUBING SIZE TUBING LOWER DEPTH TUBING UPPER DEPTH PACKER DEPTH

WORK PERMITS

REFERENCE NUMBER APPLICATION DATE EXPIRATION DATE WORK PERMIT TYPE WORK PERMIT STATUS WORK PERMIT STATUS_DATE TOTAL DEPTH WORK_PERFORMED DOCUMENTATION RECEIPT DATE TEST SAND WORK DESCRIPTION
44-18 02/01/2018 02/01/2019 SIDETRACK NEW BHL (EXISTING WELL) VERBAL 03/07/2018 18000 N AUSTIN CHALK DRILL PIPE STUCK. BK OFF DP @ 14,120'. PUMP 38 BBL OF 17 PPG CMT AND SPOT BAL PLUG. CMT FROM 13,980' TO 13,033'. CMT 150' INSIDE 7-5/8". KOP 13,300. DRILL NEW LAT 250'E OF EXISTING LAT TO TD 18,000
48-18 03/06/2018 03/06/2019 SIDETRACK NEW BHL (EXISTING WELL) VERBAL 03/07/2018 18000 N AUSTIN CHALK WP 44-18 UNSUCCESSFUL: SET CMT RETAINER @ 13,089 & PUMP 100 BBLS CMT FROM 13,089 TO 13,511'. PUMP 3 BBLS CMT ON TOP OF CMT RETAINER. SET WHIP STOCK AT 13,083 AND DRILL NEW LAT TO 18,000.

RSS

Support GoHaynesvilleShale.com

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service