It appears as though EnCana has selected a location for one of their initial pilots of the "Gas Factory" concept. They have recently permitted six (6) new wells that will all be drilled from a surface location in the southwest corner of Section 26 in T15N-R14W. Four (4) of these wells will be drilled into Section 35 and the remaining two (2) drilled in Section 26. There is already one previously drilled well at this surface location.
EnCana, Jackson Davis 26 #H2 Well, Serial #241289, S26-T15N-R14W
11 members
458 members
151 members
195 members
19 members
406 members
252 members
388 members
174 members
68 members
Posted by Char on May 29, 2025 at 14:42 — 4 Comments
© 2026 Created by Keith Mauck (Site Publisher).
Powered by