SERIAL |
WELL NAME |
WELL NUM |
ORG ID |
FIELD |
PARISH |
PROD TYPE |
SEC |
TWN |
RGE |
EFFECTIVE DATE |
API NUM |
AUS C RA SUU;CROSBY 10 |
001 |
010 |
02S |
06W |
09/10/2019 |
17115202360000 |
PRMT DATE |
SPUD DATE |
STAT DATE |
ST CD |
09/10/2019 |
09/10/2019 |
WELL SURFACE COORDINATES
Surface Longitude |
Surface Latitude |
Lambert X |
Lambert Y |
Ground Elevation |
Zone |
Datum |
0-0-0 |
0-0-0 |
1854779 |
83393 |
147 |
N |
NAD-27 |
WELL SURFACE COORDINATES GENERATED BY DNR
UTMX 83 |
UTMY 83 |
LONGITUDE 83 |
LATITUDE 83 |
|
503528.73272131 |
3417994.6699834 |
-92.96308341 |
30.89526444 |
BOTTOM HOLE COORD
EFFECTIVE DATE |
END DATE |
PLUGBACK TOTAL DEPTH |
TRUE VERTICAL DEPTH |
MEASURED DEPTH |
LAT DEG |
LAT MIN |
LAT SEC |
LONG DEG |
LONG MIN |
LONG SEC |
COORDINATE SOURCE |
LAMBERT X |
LAMBERT Y |
ZONE |
COORDINATE SYSTEM |
09/10/2019 |
16200 |
23000 |
3136160 |
136624 |
N |
||||||||||
09/10/2019 |
16200 |
23000 |
1855372 |
75919 |
N |
WELL HISTORY
SERIAL |
WELL NAME |
WELL NUM |
ORG ID |
FIELD |
ST CD |
PT |
WELL CLASS |
EFF DATE |
END DATE |
STAT DATE |
251932 |
AUS C RA SUU;CROSBY 10 |
001 |
P5184 |
8744 |
01 |
00 |
09/10/2019 |
09/10/2019 |
SCOUT INFO
REPORT DATE |
WELL STATUS |
MEASURED DEPTH |
TRUE VERT DEPTH |
DETAIL |
09/10/2019 |
01 |
23000 |
984' FSL & 291' OF SEC 10. PBHL: 1047' FNL & 226' FWL OF SEC 23, ALLEN PARISH. |
Tags:
FYI — This flare is not at the well site; but actually at the gathering facility located about a half mile East of the well.
Thanks for the correction.
Wonder if Prime Rock will follow Marathon's lead?
Doesn't look like they have fracked Crosby 10 yet. They are drilling a SWD well currently.
The Crosby well is reported having tested 1800 plus BBL's oil/day on SORIS.
Thanks for posting, Bob.
So is that over 11,000 barrels of water per day? So about 6 times as much water as oil?
Correct. Prime Rock has one operational SWD well and a permit for another so I suspect high produced water volumes were anticipated.
Can that be economical?
Beats paying for disposal services but whether economic or not is above my paygrade. Prime Rock has no well cost form posted and they have three more months on their live permit for the next well. We'll have to wait and see if they decide to spud the next well.
Thanks for sharing your knowledge.
Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…
ContinuePosted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40
386 members
27 members
455 members
440 members
400 members
244 members
149 members
358 members
63 members
119 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com