SERIAL WELL NAME WELL NUM ORG ID FIELD PARISH PROD TYPE SEC TWN RGE EFFECTIVE DATE API NUM
252648 AUS C RA SUS;CROSBY 33 H 001 P5184 6565 40 00 033 01N 04W 01/28/2021 17079205510000
PRMT DATE SPUD DATE STAT DATE ST CD
01/28/2021 01/28/2021 01

WELL SURFACE COORDINATES

Surface Longitude Surface Latitude Lambert X Lambert Y Ground Elevation Zone Datum
0-0-0 0-0-0 1908920 125540 196 N NAD-27

WELL SURFACE COORDINATES GENERATED BY DNR

UTMX 83 UTMY 83 LONGITUDE 83 LATITUDE 83
519964.62141662 3430910.85002291 -92.79085315 31.01164678 View GIS

BOTTOM HOLE COORD

EFFECTIVE DATE END DATE PLUGBACK TOTAL DEPTH TRUE VERTICAL DEPTH MEASURED DEPTH LAT DEG LAT MIN LAT SEC LONG DEG LONG MIN LONG SEC COORDINATE SOURCE LAMBERT X LAMBERT Y ZONE COORDINATE SYSTEM
01/28/2021 14700 21761 02 1908916 133236 N 01

WELL HISTORY

SERIAL WELL NAME WELL NUM ORG ID FIELD ST CD PT WELL CLASS EFF DATE END DATE STAT DATE
252648 AUS C RA SUS;CROSBY 33 H 001 P5184 6565 01 00 01/28/2021 01/28/2021

SCOUT INFO

REPORT DATE WELL STATUS MEASURED DEPTH TRUE VERT DEPTH DETAIL
01/28/2021 01 21761 294' FSL & 802' FWL OF SEC 33-T1N-R4W. PBHL: 2577' FSL & 800' FWL OF SEC 28-T1N-R4W.

Views: 1377

Replies to This Discussion

3454' in a week / finally got into drilling groove. Should be at TD by next week's report.

Looking forward to seeing the final drilling and completion costs for this well once it is posted

Prime Rock received a work permit on 5/4 for the following:

PRESSURE TEST CSG. PERFORATE FROM 20,414'-14,635'. HYDAULIC FRACTURE IN 30 STAGES W/1500 GAL OF ACID, 500,000 LBS OF SAND & 8,500 BBLS OF WATER PER STAGE.

Additionally, the Prime Rock Crosby SWD #2 was spud on 5/3.

Glad to see that they got lateral to TD and got casing set.

Only have a 5779' long section of lateral to frac / complete here.

  • On comparison, operators in other unconventional horizontal plays are drilling 10,000' in their sleep and now regularly getting 15,000' laterals drilled and completed.
  • With 20,000' laterals coming soon (if not already!)

Anyway, based on the work permit details, 30 frac stages so planning for 193' long completion stages. That is good - the tighter the completion zone, the better.

  • 500,000# proppant per stage works out to close to 2600# per foot of frac'd interval - very intense approach.
  • The acid used is just a clean up effort to make sure perforations are open and some initial etching of the carbonate reservoir is initiated. .
  • Frac fluid volumes of 44 bbls per foot also high.

Big money going into this frac job. Results will be interesting as to O&G volumes..

Operator is expected a LOT of water  (as am I) - ergo the SWD well being drilled. 