Recent information revealed a 2nd well in Sabine Parish was tested at over 20 MMcfd with a flowing pressure above 8000 psi. Although the well is now operated by Shell, the completion was executed by their JV partner EnCana. The previous super well was also in T9N-R11W (Section 20).
Shell, Robert Bozeman 29 #H1 Well, Serial #240815, S29-T9N-R11W, Sabine Parish, 20339 Mcfd, 25/64" Choke, 8714 psi Flowing Pressure
Tags:
ken,
No... each well is unique, therefore not all wells will have the same choke. I have noticed that Encana uses a lot of 25/64 chokes, but not exclusively.
fyi, there is a well permitted in s32, 9n, 11w:
| 242810 | HA RA SUHH;LABOKAY 32-9-11 H |
What about EnCana, Jean Larsen 17 #H1 Well, Serial #242201, S17-T9N-R11W
Any news?
Can't depend on Sonris for timely info. I have a well in production now 3 weeks that was drilled 9 months ago and it still has it listed as reaching "TD" that was posted in November 2010. Go figure