Recent information revealed a 2nd well in Sabine Parish was tested at over 20 MMcfd with a flowing pressure above 8000 psi. Although the well is now operated by Shell, the completion was executed by their JV partner EnCana. The previous super well was also in T9N-R11W (Section 20).
Shell, Robert Bozeman 29 #H1 Well, Serial #240815, S29-T9N-R11W, Sabine Parish, 20339 Mcfd, 25/64" Choke, 8714 psi Flowing Pressure
Tags:
ken,
No... each well is unique, therefore not all wells will have the same choke. I have noticed that Encana uses a lot of 25/64 chokes, but not exclusively.
fyi, there is a well permitted in s32, 9n, 11w:
242810 | HA RA SUHH;LABOKAY 32-9-11 H |
What about EnCana, Jean Larsen 17 #H1 Well, Serial #242201, S17-T9N-R11W
Any news?
Can't depend on Sonris for timely info. I have a well in production now 3 weeks that was drilled 9 months ago and it still has it listed as reaching "TD" that was posted in November 2010. Go figure
Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…
ContinuePosted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40
386 members
27 members
455 members
440 members
400 members
244 members
149 members
358 members
63 members
119 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com