Recent information revealed a 2nd well in Sabine Parish was tested at over 20 MMcfd with a flowing pressure above 8000 psi. Although the well is now operated by Shell, the completion was executed by their JV partner EnCana. The previous super well was also in T9N-R11W (Section 20).
Shell, Robert Bozeman 29 #H1 Well, Serial #240815, S29-T9N-R11W, Sabine Parish, 20339 Mcfd, 25/64" Choke, 8714 psi Flowing Pressure
Tags:
ken,
No... each well is unique, therefore not all wells will have the same choke. I have noticed that Encana uses a lot of 25/64 chokes, but not exclusively.
fyi, there is a well permitted in s32, 9n, 11w:
| 242810 | HA RA SUHH;LABOKAY 32-9-11 H |
What about EnCana, Jean Larsen 17 #H1 Well, Serial #242201, S17-T9N-R11W
Any news?
Can't depend on Sonris for timely info. I have a well in production now 3 weeks that was drilled 9 months ago and it still has it listed as reaching "TD" that was posted in November 2010. Go figure
68 members
478 members
194 members
11 members
405 members
18 members
250 members
457 members
11 members
388 members
Posted by Char on May 29, 2025 at 14:42 — 4 Comments
© 2026 Created by Keith Mauck (Site Publisher).
Powered by