A presention by EnCana on March 16th, 2010 identified a Haynesville Shale well in Red River Parish that had a peak production rate of 37 MMcfd and was completed with 20 frac stages. This is still the highest rate of any well to date in the play.
Additional information recently posted on Sonris confirmed the George Lormand 4 #H1 Well in the Red River-Bull Bayou Field was completed with 20 frac stages. The posted production information for January/February also corresponds with the EnCana presentation. Thru April the well has produced ~ 1.7 Bcf of gas in less than 100 days. Although the "official" test rate was only 28.8 MMcfd, the well rate was still increasing as shown by the attached EnCana chart.
EnCana, George Lormand 4 #H1 Well, Serial #239966, S4-T13N-R11W, Red River Parish, 28751 Mcfd, 29/64" Choke, 8519 psi Flowing Pressure
Not taking anything away from the well because it is a monster, but the IP was on a 29/64 choke and there are wells that have produced more gas than that in their 1st 100 days of production.