SERIAL WELL NAME WELL NUM ORG ID FIELD PARISH PROD TYPE SEC TWN RGE EFFECTIVE DATE API NUM
252648 AUS C RA SUS;CROSBY 33 H 001 P5184 6565 40 00 033 01N 04W 01/28/2021 17079205510000
PRMT DATE SPUD DATE STAT DATE ST CD
01/28/2021 01/28/2021 01

WELL SURFACE COORDINATES

Surface Longitude Surface Latitude Lambert X Lambert Y Ground Elevation Zone Datum
0-0-0 0-0-0 1908920 125540 196 N NAD-27

WELL SURFACE COORDINATES GENERATED BY DNR

UTMX 83 UTMY 83 LONGITUDE 83 LATITUDE 83
519964.62141662 3430910.85002291 -92.79085315 31.01164678 View GIS

BOTTOM HOLE COORD

EFFECTIVE DATE END DATE PLUGBACK TOTAL DEPTH TRUE VERTICAL DEPTH MEASURED DEPTH LAT DEG LAT MIN LAT SEC LONG DEG LONG MIN LONG SEC COORDINATE SOURCE LAMBERT X LAMBERT Y ZONE COORDINATE SYSTEM
01/28/2021 14700 21761 02 1908916 133236 N 01

WELL HISTORY

SERIAL WELL NAME WELL NUM ORG ID FIELD ST CD PT WELL CLASS EFF DATE END DATE STAT DATE
252648 AUS C RA SUS;CROSBY 33 H 001 P5184 6565 01 00 01/28/2021 01/28/2021

SCOUT INFO

REPORT DATE WELL STATUS MEASURED DEPTH TRUE VERT DEPTH DETAIL
01/28/2021 01 21761 294' FSL & 802' FWL OF SEC 33-T1N-R4W. PBHL: 2577' FSL & 800' FWL OF SEC 28-T1N-R4W.

Views: 2144

Replies to This Discussion

Ensign rig 777 reported 15 days drilling ahead @ 13,797' on 4/1.

TVD as per permit is 14.700' - probably have started drilling curve to get set for the lateral part of the hole.

Thanks for the updates, Skip and Rockman

You're welcome, David.

Ensign rig 777 reported 22 days drilling ahead at 14,487' on 4/9.

Less than 700' of progress in past week - either a lot of tripping to change out bottom hole assemblies to drill the curve or one heck of a lot of problems.

A lot can happen when you are three miles down in in the oil field

Maybe taking cores or logging?

Perhaps logging and then running casing. And swapping out drilling fluid (water base to oil base)?

Next week's report will say a lot about how they are doing

Just checked the details in SONRIS - as of 4/1 report, they had already set 7" casing and swapped out to OBM and were drilling ahead in the curve to get to the lateral.

So only less than 700' in a week means (to me) that they are having some issues out there.

Ensign rig 777 reported 29 days drilling ahead at 15,326' on 4/16.

839' in a week - way slow / should be in the horiztonal part of the hole.

Good hz drilling progress is 1000'+ per day

Ensign rig 777 reported 36 days drilling ahead at 18,780' on 4/23.  3000' to go if drilled to permitted MD.

RSS

Support GoHaynesvilleShale.com

Blog Posts

The Lithium Connection to Shale Drilling

Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…

Continue

Posted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service