Yes, that Continental Resources. Partial sections 17-20, 3N - 11W. Just east of the South Toledo Bend State Park, Toro Road area.
https://ucmwww.dnr.state.la.us/ucmsearch/UCMRedir.aspx?url=http%3a%...
Tags:
Suggest that members do a little Google search for Continental Resources. Hint: Big Bakken oil field player.
If anyone has a way to contact Kirk Barrell, they should let him know so he can post his thoughts on this new AC player. Continental is a large publicly traded company that has never focused on the Chalk or even Louisiana so this is very interesting.
I agree that it would be good to hear Kirk's opinion but don't you think he already knows about this application? If not, he must be solely focused on solar farms these days.
Assuming that Continental will be chasing Austin Chalk here with a horizontal / frac stimulation effort.
Note the well noted on SE part of the plat (Swift Sonat horizontal). Drilled and "completed" in 1992. Swift got the lateral to TD (about a 4000' lateral in the AC) after having to abandon original lateral. At TD, Sonal took over operations .
A frac was attempted on the lateral (in slotted liner). Well only IP'd 50 BO & 270 MCF per day from the entire lateral. Well only produced about 900 BO before being abandoned. This was called North Haddens Field.
I attached the hand written scout card for this well. No idea what this cost but it was a LOT.
For their sake, I hope that Continental has some good data to support this effort - not a lot of well control here to support AC matrix porosity play.
On 12/10, Nabors Drilling Rig #B15 reported 10 days Drilling Ahead @ 9776' on the Continental Resources Labokay 20-17 H #1.
Can anyone explain what all of this means? I was able to find it on Sonris, but I don't understand it except it looks like they now have a permit to frac. Thanks.
WELLS
SERIAL | WELL NAME | WELL NUM | ORG ID | FIELD | PARISH | PROD TYPE | SEC | TWN | RGE | EFFECTIVE DATE | API NUM |
---|---|---|---|---|---|---|---|---|---|---|---|
253085 | AUS C RA SUB;LABOKAY 20-17 H | 001 | C111 | 4382 | 58 | 00 | 020 | 03N | 11W | 11/12/2021 | 17115202380000 |
PRMT DATE | SPUD DATE | STAT DATE | ST CD |
---|---|---|---|
11/12/2021 | 11/12/2021 | 01 |
WELL SURFACE COORDINATES
Surface Longitude | Surface Latitude | Lambert X | Lambert Y | Ground Elevation | Zone | Datum |
---|---|---|---|---|---|---|
0-0-0 | 0-0-0 | 1682838 | 202356 | 317 | N | NAD-27 |
WELL SURFACE COORDINATES GENERATED BY DNR
UTMX 83 | UTMY 83 | LONGITUDE 83 | LATITUDE 83 | |
---|---|---|---|---|
450973.95771582 | 3453995.45960134 | -93.51472795 | 31.21908019 | View GIS |
BOTTOM HOLE COORD
EFFECTIVE DATE | END DATE | PLUGBACK TOTAL DEPTH | TRUE VERTICAL DEPTH | MEASURED DEPTH | LAT DEG | LAT MIN | LAT SEC | LONG DEG | LONG MIN | LONG SEC | COORDINATE SOURCE | LAMBERT X | LAMBERT Y | ZONE | COORDINATE SYSTEM |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
11/12/2021 | 9632 | 20318 | 02 | 1682699 | 212632 | N | 01 |
WELL HISTORY
SERIAL | WELL NAME | WELL NUM | ORG ID | FIELD | ST CD | PT | WELL CLASS | EFF DATE | END DATE | STAT DATE |
---|---|---|---|---|---|---|---|---|---|---|
253085 | AUS C RA SUB;LABOKAY 20-17 H | 001 | C111 | 4382 | 01 | 00 | 11/12/2021 | 11/12/2021 |
SCOUT INFO
REPORT DATE | WELL STATUS | MEASURED DEPTH | TRUE VERT DEPTH | DETAIL |
---|---|---|---|---|
01/10/2022 | 31 | 20125 | 9712 | SCOUT CODE 31: 1/4/2022 TUES. 6:00 AM - RUN 5'',18#, P-110, WEDGE 513 CASING F/ 6650' T/ 10,322'. SWAP T/ 5 1/2'' HANDLING EQ RUN CSG T/ 13,750'; 1/5/2022 WED. 6:00 AM - RUN 5 1/2" CSG F/ 13,750' T/ 16,959' WASH & REAM TO BOTTOM. LAND HANGER WITH SHOE @ 20,125'. CIRC 1.5 CSG CAPACITIES, CEMENT AS PER PLAN WITH FULL RETURNS. BUMPED PLUG W/ 3500 PSI. BLED BACK 5 BBLS. FLOATS HELD OK R/D CEMENTERS AND BACK OUT LANDINGJT; 1/6/2022 THURS. 6:00 AM - SET PACK OFF, CLEAN PITS,FLUSH SURFACE LINES, ND BOPS, NU TBG HEAD, TEST SEALS TO 15K VOID TO 10K. LD 60 STANDS DP FROM DERRICK. START RIGGING DOWN TOP DRIVE.; 1/7/2022 FRI. 6:00 AM - FINISH CLEANING PITS RIG RELEASE 11:00HRS, 1/6/22. RIG DOWN AND WASH RIG; 1/8/2022 SAT. 6:00 AM - RIG DOWN ON LABOKAY 20-17 H1, SCATTER AND WASH RIG.; 1/9/2022 SUN. 6:00 AM - RIG DOWN ON LABOKAY 20-17 H1, SCATTER AND WASH RIG; 1/10/2022 MON. 6:00 AM - WASH RIG AND CLEAN CELLAR |
01/03/2022 | 31 | 20125 | 9712 | SCOUT CODE 31: 12/28/2021 TUES. 6:00 AM - TIME DRILL AS PER PLAN F/ 16,431' T/ 16,438' DRILL 6 3/4" LATERAL T/ 16,713. CONFIRM NOT IN OLD HOLE. CBU. TOOH TO BHA.; 12/29/2021 WED. 6:00 AM - LD SIDE TRACK ASSY, FUNCTIONED BOP'S, PU LATERAL ASSY, TIH CUT DRILL LINE @ 7,100'. TIH & RELOG LAST 30' TO BOTTOM; 12/30/2021 THURS. 6:00 AM - DRILL 6 3/4" LATERAL F/ 16,713' T/ 18,208' AT 18,038' (TD ORIGINAL WELLBORE) WAS 49' FROM OLD WELL.; 12/31/2021 FRI. 6:00 AM - DRILL 6 3/4" LATERAL F/ 18,208' T/ 19,100' ; 1/1/2022 SAT. 6:00 AM - DRILL 6 3/4" LATERAL F/ 19,100' T/ 20,135' ( TD ). PUMPED 40 BBL SWEEP AND CIRC. CLEAN UP CYCLE; 1/2/2022 SUN. 6:00 AM - FINISH CLEAN UP CYCLE. TOOH & LAY DOWN 4.5'' DRILL PIPE, RACKED BACK 60 STDS 4.5'' IN DERRICK.; 1/3/2022 MON. 6:00 AM - FINISH LAYING DOWN DRILL PIPE & BHA.PULL WEAR BUSHING. RIG UP NABORS CRT & CSG EQ. MAKE UP SHOE TRACK, PUMP THROUGH SAME,RUN 5'',18#, P-110, WEDGE 513 CASING T/ |
12/27/2021 | 05 | 16431 | 9921 | SCOUT CODE 5: 12/21/2021 TUES. 6:00 AM - DRILL 6 3/4" LATERAL F/ 16,540' T/ 17,518'.; 12/22/2021 WED. 6:00 AM - DRILL 6 3/4" LATERAL F/ 17,518' T/ 18,023'.; 12/23/2021 THURS. 6:00 AM - DRILL 6 3/4" LATERAL F/ 18,023' T/ 18,038'. BKREAM & TOOH TO BHA MM PARTED @ CONNECTION ABOVE BEND LEAVING 8.53' OF FISH IN HOLE. PULL WEAR BUSHING & TEST BOP'S; 12/24/2021 FRI. 6:00 AM - INSTALL WEAR BUSHING PU SIDETRACK ASSY/ RECEIVED VERBAL APPROVAL F/SIDETRACK 10:30HRS, 12/23/21. TIH W/ SIDETRACK ASSY AND TROUGH F/ 16,374' T/ 16,404'; 12/25/2021 SAT. 6:00 AM - TROUGH F/ 16,374' T/ 16,404'. UNABLE TO HOLD 165°R TOOLFACE.TOOH T/ 4,650'; 12/26/2021 SUN. 6:00 AM - TOOH LAY DOWN BHA PU NEW SIDETRACK ASSY W/ SECURITY FX73 BIT & 2°BEND MM. TIH T/ 16,374' AND 4% LUBE TO MUD SYSTEM. TROUGH F/ 16,374' T/ 16,604' @ 165° TF; 12/27/2021 MON. 6:00 AM - TROUGH F/ 16,374' T/ 16,604' @ 165° TF. TIME DRILL AS PER PLAN F/ 16,604' T/ 16,431' |
12/20/2021 | 05 | 16540 | 9921 | SCOUT CODE 5: 12/14/2021 TUES. 6:00 AM - FINISH TIH W/ LATERAL ASSY, DRILL T/ 11,117'; 12/15/2021 WED. 6:00 AM - DRILL 6 3/4" LATERAL F/ 11,117' T/ 12,816'; 12/16/2021 THURS. 6:00 AM - DRILL 6 3/4" LATERAL F/ 12,816' T/ 13,884'; 12/17/2021 FRI. 6:00 AM - DRILL 6 3/4" LATERAL F/ 13,884' T/ 13,940'. MM FAILURE, CBU, TOOH, LD BHA. PU BAKER RTTS PACKER, TIH T/ 9,648' ( 25' ABOVE FLT COLLAR). SET PKR AND TEST CSG T/ 1600 PSI FOR 1/2 HR; 12/18/2021 SAT. 6:00 AM - TOOH LD RTTS, FUNCTIONED BOP'S, PICK UP NEW LATERAL ASSY, TIH, DRILL 6 3/4" LATERAL F/ 13,940' T/ 14,127'. HELD BOP DRILL. 53SECONDS.; 12/19/2021 SUN. 6:00 AM - DRILL 6 3/4" LATERAL F/ 14,127' T/ 15,455'.; 12/20/2021 MON. 6:00 AM - DRILL 6 3/4" LATERAL F/ 15,455' T/ 16,540'. |
12/14/2021 | 05 | 11323 | SCOUT CODE 5: 12/8/2021 TUES. 6:00 AM - L/D 5" DP @ INT. CASING POINT ; 12/9/2021 WED. 6:00 AM - LAYING DOWN CASING TO REGAIN RETURNS ; 12/10/2021 THURS. 6:00 AM - CEMENT CASING, C/O PIPE RAMS ; 12/11/2021 FRI. 6:00 AM - TEST BOPS, PICK UP CURVE BHA AND 4.5" DP, TOOH FOR PLUGGED STRING ; 12/12/2021 SAT. 6:00 AM - DRILLING 6 3/4" CURVE ; 12/13/2021 SUN. 6:00 AM - TOOH TO PICK UP LATERAL ASSY. ; 12/14/2021 MON. 6:00 AM - TIH HOLE WITH LATERAL ASSY. | |
12/06/2021 | 05 | 9147 | SCOUT CODE 5: 11/30/2021 TUES. 6:00 AM - MOVE IN RIG UP ON LABOKAY PAD; 12/1/2021 WED. 6:00 AM - RIG UP ON WELL. NU DIVERTOR. RU CELLAR PUMPS. PICK UP SURFACE BHA.; 12/2/2021 THURS. 6:00 AM - SPUD WELL 06:30HRS. 12/1/21.DRILL F/ 125' T/ 1849'. WIPER TRIP TO 1147' AND BACK TO BOTTOM. TOOH & LD BHA.; 12/3/2021 FRI. 6:00 AM - RU NABORS CSG CREW & CRT, RUN 10 3/4" CSG T/1051', CBU, RUN CSG AND LAND HANGER IN LANDING RING WITH SHOE @ 1839'. CIRC 1.5 CSG VOLUMES. CMT AS PER PLAN, TEST CSG TO 1500 PSI 1/2HR. RD CEMENTERS, ND DIVERTOR, NU CACTUS MBU WH & TEST T/3K. NU BOP'S & RELATED EQ.; 12/4/2021 SAT. 6:00 AM - FINISH TESTING BOP'S,PU 9 7/8" INTERMEDIATE ASSY. DRILL CMT, SHOE TRACK & 10' NEW HOLE TO 1859'.CBU, FIT TO 11.5# EMW WITH 220PSI. DRILL F/1859' T/2866'; 12/5/2021 SUN. 6:00 AM - DRILL 9 7/8" INTERMEDIATE F/ 2866' T/ 7120'; 12/6/2021 MON. 6:00 AM - DRILL 9 7/8" INTERMEDIATE F/ 7120' T/ 9,147, CBU IN PREPARATION TO TOOH | |
11/12/2021 | 01 | 20318 | 220' FSL & 2572' FWL OF SEC 20-T3N-R11W. PBHL: 100' FNL & 2317' FWL OF SEC 17-T3N-R11W. |
PERFORATIONS
SERIAL NUM | COMPLETION DATE | UPPER PERF | LOWER PERF | SANDS | RESERVOIR |
---|
WELL TESTS
RPT TYP | TEST DATE | RPT DATE | OIL POT | COND | GAS DEL | WATER | BSW% | FLOW PRES | SHUTIN PRES | CHOKE | UPPER PERF | LOWER PERF | BOT HOLE PRES |
---|
WELL ALLOWABLES
EFFECTIVE DATE | END DATE | LUW CODE | LUW TYPE CODE | ALLOWABLE | ESTIMATED POTENTIAL | CURRENT ALLOWABLE TYPE |
---|
LEASE\UNIT\WELL ASSOCIATION HISTORY
EFFECTIVE DATE | END DATE | LUW CODE | LUW TYPE | LUW NAME | REPORTING PCT | PRIMARY LUW FLAG |
---|
LEASE\UNIT\WELL PRODUCTION
RPT DATE | LUW CODE | STORAGE FAC | DOC USE | WELL CNT | OPENING STK | OIL PROD(BBL) | GAS PROD(MCF) | DISPOSITION | CLOSING STK | PARISH |
---|
CASING
COMPLETION DATE | CASING SIZE | WELLBORE SIZE | CASING WEIGHT | UPPER SET DEPTH | LOWER SET DEPTH | CEMENT SACKS | TEST PRESSURE | HOURS UNDER PRESSURE | TEST DATE | CASING PULLED | CREATION PROCESS |
---|
PLUG AND ABANDON
P and A DATE | LOCATION TYPE | CASING CUT TYPE | CASING CUT DEPTH | MUD WEIGHT LEFT | COMMENTS |
---|
PLUGS
PLUG TYPE | UPPER PLUG DEPTH | LOWER PLUG DEPTH | SACKS OF CEMENT | SLURRY WEIGHT |
---|
TUBING AND PACKERS
COMPLETION DATE | TUBING SIZE | TUBING LOWER DEPTH | TUBING UPPER DEPTH | PACKER DEPTH |
---|
WORK PERMITS
REFERENCE NUMBER | APPLICATION DATE | EXPIRATION DATE | WORK PERMIT TYPE | WORK PERMIT STATUS | WORK PERMIT STATUS_DATE | TOTAL DEPTH | WORK_PERFORMED | DOCUMENTATION RECEIPT DATE | TEST SAND | WORK DESCRIPTION |
---|---|---|---|---|---|---|---|---|---|---|
20-22-6 | 01/18/2022 | 01/14/2023 | SIDETRACK | APPROVED | 01/18/2022 | 0 | N | SIDE TRACK DATE- 12/26/2021, 1.5 HOURS. ORIENT TF TO 165 R A D TROUGH F/16.374 T/16, 04. TIME DRIL F/16, 404 T/16,431' AND | ||
21-22-3-14 | 01/18/2022 | 01/10/2023 | HYDRAULIC FRACTURE STIMULATION | APPROVED | 01/18/2022 | 0 | N | ZFRAC AND PERF AUSTIN CHALKK FROM 10,337-20,081. 39 STAGES. |
Yep, the rig has drilled and cased the well. Likely long gone by now. The well is now approved for the frac and waiting on a completion crew.
Building on Skip's comment......
Operator had a heck of time getting this well / lateral drilled to TD based on the reports posted on SONRIS.
They were drilling lateral with no problems until twisting off drilling assembly at 18,038'.
Pulled back to about 16,400' to start the sidetrack and were successful in starting a new hole / lateral - drilled lateral to 19,100' and set casing.
Sidetrack / new part of the hole is 49' from the original hole that contains the fish.
Questions / Concerns as to completion -
PS - and totally unrelated comment - maybe I should offer classes in SONRIS report interpretation? LOL
I'd go to class for sure. :-)
Thanks Skip and Rock Man for explaining the well report in layman's terms. I did note the 49' issue but thought that was in reference to the nearby well drilled decades ago. Very interesting insight to the drilling process, their complications and plan B sidetrack. I could never have deciphered that from the report. Good point with your concern about fracking so close to the open lateral. We'll see what the future brings. Thanks again Professor!
Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…
ContinuePosted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40
9 members
120 members
97 members
34 members
386 members
27 members
455 members
440 members
400 members
244 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com